20 Lines on Umrong in English
Hello Student, Here in this post, we have posted 20 lines on Umrong in English. Students (Class 1 to 8) who want to know a detailed knowledge about Umrong, then here we have given a detailed view about 20 Lines Paragraph on Umrong in English. This Paragraph is very Simple.
20 Lines Paragraph on Umrong in English
Hope above 20 lines on Umrong in English will help you to study. For any help regarding education Students please comment us. Here we are always ready to help You.
(1) It is a hydroelectric project.
(2) The name of the project is Kopili Hydro Electric Project.
(3) It has 275 MW hydroelectric power.
(4) This project is situated on the river of Kopili.
(5) It is located in Dima Hasao distict.
(6) It is Assam state in India.
(7) The project is developed and operated by North Eastern Electric Power Corporation Limited.
(8) It is an important project since the Indian state of Assam, Arunachal Pradesh, Manipur, Meghalaya etc. district also get benefit from this project.
(9) This is a power related project.
(10) The opening date of the dam is 1984.
(11) It constructed by the Govt. of India.
(12) This dam also impound on the Kopili River.
(13) The height of the dam is 66metre.
(14) The length of the dam is 243metre.
(15) There have reservoir, Kopili Reservoir.
(16) It has total 166800 capacity.
(17) There have also a power house, Khandong Power House.
(18) It is commissioned on 8th March 1984.
(19) This dam has 75MW turbines.
(20) The annual generation power of the dam is 363.9 MU.
Similar Links:-